The plan was to move all of the University departments onto one site, thus generating a compact campus. This required 36 of the teaching and leacture rooms to be fitted with audio-visual systems for lecture enrichment. The audio-visual contract was for rooms of differing sizes to be integrated with a mixture of products, dependent on size and usage.
|
|
The implementation of a strong project management ethos was required. This was mainly due to the property being a listed building and great care was required in the implentation of the project. As with all projects, building delays occur. This was a challenge to our installation team to facilitate lectures round the integration plan. All fittings to the main structure had to be approved by the authorities along with the delays, inherent in a project such as this.
The FCS system ensures that the installation teams are supported from the office base, thus providing continuity and progressive stock deliveries as and when required.